// Installation & delivery
Delivered, installed, and ready from day one.
Your chamber doesn't arrive as a box of parts. Our own team delivers it, places it, connects it, and commissions it on site — then trains yours before we leave.
// What we handle
A complete handover — not a delivery.
Everything between our production floor and your first session is ours to manage.
Delivery & placement
We coordinate transport, access planning for tight entries, and careful positioning into the final location.
Assembly & connection
On-site assembly, power and gas connections, and integration with your room — handled by our own technicians.
Commissioning & safety
Full pressure and safety testing, calibration, and a documented commissioning report before sign-off.
// On-site process
Five steps on site.
Pre-delivery site check
We confirm dimensions, access, power, and ventilation against our site checklist — so delivery day has no surprises.
Delivery & placement
Transport and careful positioning into the final location, with protection for floors and access routes.
Assembly & connection
Final assembly, electrical and gas connections, and integration with your room services.
Commissioning & safety test
Pressure testing, calibration, and full safety checks — documented in a commissioning report.
Handover & training
We train your operators, hand over full documentation, and activate your warranty and service plan.
// Why it matters
Installed by the people who built it.
Factory-trained team
The technicians who install your chamber are trained on the same units they're built on — never third-party installers.
Safety-first commissioning
Every unit is pressure-tested and safety-checked on site, with a signed commissioning report you keep on file.
One point of contact
From delivery to training you deal with one Oxyliving team — and the same team supports you long after.
// Getting ready
What we bring, what you prepare.
You'll receive a full site checklist after your order. Here's the short version.
// Oxyliving handles
We take care of
- Logistics, transport, and delivery scheduling
- Positioning, assembly, and integration
- Electrical and gas connection
- Pressure and safety testing
- Operator training and documentation
// On your side
You prepare
- A clear access route and final location
- Power supply to specification (we confirm)
- Adequate ventilation for the space
- A level, load-rated floor
- A point of contact on site for delivery day
// Get started
Planning an installation?
Tell us about your space and we'll prepare a tailored quote and a full site checklist.